Fuse 1 speed

Any idea of Fuse 1 speed?
I read on specs that it will be 10mm/hour, but as it depends on model form and size, I still have some doubts.

For example what time is required to process the whole building area filled with chess tower models? (0.100 layer, I think about 800 pieces).

Any idea?

Ty, Michele